...
首页> 外文期刊>Power UK >Gerald Wingrove, Drax Power chief executive
【24h】

Gerald Wingrove, Drax Power chief executive

机译:Drax Power首席执行官Gerald Wingrove

获取原文
获取原文并翻译 | 示例
           

摘要

The 4GW Drax coal-fired power station in the north of England supplies some 7% of the UK's electricity needs. However, it has suffered a turbulent couple of years. The failure of its previous owner, AES, and TXU Europe to renegotiate a large offtake contract for the plant helped trigger the latter's demise and led to an uncertain few months for Drax. Last year, AES stepped away from the plant leaving its fate to a new management team and the banks and other financiers who now own the plant. Just before Christmas, a new restructuring package was agreed and with wholesale power prices up on the previous year, the future of Drax seems to be looking rosier than it has for some time. Dominic Maclaine asked its chief executive about Drax's recovery and his plans for the future.
机译:英格兰北部的4GW Drax燃煤电站满足英国约7%的电力需求。但是,它经历了几年动荡。其先前的所有者AES和TXU Europe未能重新谈判该工厂的大量承购合同,这导致了该工厂的灭亡,并给Drax带来了不确定的几个月。去年,AES离开了工厂,将命运留给了一个新的管理团队以及现在拥有该工厂的银行和其他金融家。在圣诞节之前,就新的重组计划达成了一致,并且上一年的批发电价上涨,Drax的未来似乎比一段时间前更加光明。多米尼克·麦克莱恩(Dominic Maclaine)向其首席执行官询问了德拉克斯的康复情况以及他的未来计划。

著录项

  • 来源
    《Power UK》 |2004年第122期|p.43-46|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 电工技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号