首页> 外文期刊>Proceedings of the Institution of Civil Engineers >Failure of a corroded pile closed Larivot bridge and divided French Guiana
【24h】

Failure of a corroded pile closed Larivot bridge and divided French Guiana

机译:锈蚀的桩的失效关闭了Larivot桥和法属圭亚那

获取原文
获取原文并翻译 | 示例
           

摘要

The Larivot highway bridge is 1225 m long and carries a two-lane road over the Cayenne tidal river in the department of French Guiana. Following the discovery in November 2009 of a failed pile, which raised fears of the collapse of a pier, the bridge was closed to traffic; this virtually cut the department into two parts. Owing to the rapid mobilisation of all participants (the French Ministry of Transport and companies), the bridge was reopened in less than four months. The investigation, temporary strengthening measures and the full remedial work were carried out with full precautions for the safety of users and workers. This paper describes the highlights of this operation and draws lessons for the design and management of similar structures.
机译:Larivot公路大桥长1225 m,在法属圭亚那省的Cayenne潮河上有两条车道。在2009年11月发现一桩失败的桩之后,人们担心码头会倒塌,因此这座桥已禁止通行。这实际上将部门划分为两个部分。由于所有参与者(法国运输部和公司)的迅速动员,该桥在不到四个月的时间内重新开放。进行了调查,临时加强措施和全面的补救工作,并为用户和工人的安全采取了充分的预防措施。本文介绍了此操作的重点,并为类似结构的设计和管理提供了经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号