The North Morecambe gas field which came on stream in October 1994 with a total cost of £600 million is the largest single capital investment made by British Gas in recent years. The field, with reserves of 30 billion m~3 (1.06 trillion ft~3), is characterized by a shallow reservoir with a high level of inert gases. The development comprises a single, normally unmanned platform linked by a 38 km long, 914 mm diameter pipeline to a new terminal at Barrow-in-Furness. The terminal incorporates plant for both carbon dioxide and nitrogen removal and is the most process-intensive reception facility in the UK. This paper describes the process technology applied to achieve the required ' sales gas' characteristics and the project execution strategy. The development was approved in April 1991 and required a 42-month schedule for construction and commissioning. Studies estimated three million man-hours for construction trades which required an innovative and flexible approach to the construction works.
机译:北部莫克姆气田于1994年10月投入生产,总成本达6亿英镑,是近年来英国天然气公司进行的最大一笔资本投资。该油田的储量为300亿立方米(1.06万亿英尺3),其特征是储层浅,惰性气体含量高。该开发项目包括一个通常无人驾驶的平台,该平台通过一条38公里长,直径914毫米的管道连接到巴罗因弗内斯的新码头。该终端包括用于去除二氧化碳和氮气的工厂,并且是英国流程最密集的接收设施。本文介绍了用于实现所需“销售气体”特征的过程技术以及项目执行策略。该开发项目于1991年4月获得批准,需要42个月的施工和调试时间表。研究估计,建筑行业的工时为300万工时,这需要创新且灵活的建筑方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号