...
【24h】

SPARE CARE

机译:备件

获取原文
获取原文并翻译 | 示例
           

摘要

Three ways you can reduce the toted operating cost associated with your process heating equipment are:rn1. Improve equipment uptime, by ensuring only the highest performing replacement parts are used in equipment repair.rn2. Reduce the time required to repair a piece of equipment.rn3. Reduce the overall cost to specify, procure and inventory replacement parts.rnGenerally the most cosdy replacement part is the one you cannot get in a reasonable length of time. The facility loses production, incurring overtime costs to meet shipment commitments. The purchasing depart must scramble to locate the replacement part — often paying a premium to purchase and ship the parts. The part in question may no longer be manufactured or have an excessive lead time, so plant engineering must work to apply a part that is far from the original.
机译:减少与过程加热设备相关的总运行成本的三种方法是:rn1。通过确保仅在设备维修中使用性能最高的替换零件来提高设备的正常运行时间。减少维修设备所需的时间。rn3。减少指定,采购和库存替换零件的总成本。通常,最麻烦的替换零件是您在合理的时间内无法获得的零件。该工厂损失了生产,产生了加班成本,无法履行装运承诺。采购部门必须争先恐后地找到替换零件-通常要支付一定的费用才能购买和运输零件。有问题的零件可能不再制造或交货时间过长,因此工厂工程必须努力应用与原始零件相距甚远的零件。

著录项

  • 来源
    《Process Heating》 |2009年第5期|30|共1页
  • 作者

    John B. Clarke;

  • 作者单位

    Diamond Engineering Inc.;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号