...
首页> 外文期刊>Progressive Railroading >For The Ic&e, A Winter Of Content
【24h】

For The Ic&e, A Winter Of Content

机译:对于Ic&e,内容丰富的冬天

获取原文
获取原文并翻译 | 示例
           

摘要

In the cold and snowy Midwest,finding a railroad contractor to take on a last-minute rail installation job in winter can be a real challenge.Confronted with that very issue last December,the Iowa,Chicago & Eastern Railroad Corp.(IC&E) turned to L.A.Colo L.L.C. 'We scrambled and were able to put a crew together pretty fast,' says Colo President Roy Dano.'We have more than 200 pieces of specialized equipment to handle tie and rail projects,and that helps us to respond quickly and put gangs and smaller crews together.' Although the short timeframe and daunting weather posed a few challenges,Colo delivered on its project promise,demonstrating why Colo remains on the contractor call list for the 1,400-mile IC&E and other midwestern railroads,Dano says.
机译:在寒冷多雪的中西部地区,寻找铁路承包商在冬季进行最后一分钟的铁路安装工作可能是一个真正的挑战。去年12月,面对这一问题,爱荷华州,芝加哥和东方铁路公司(IC&E)转向转到LAColo LLC科罗拉多州总统罗伊·达诺(Roy Dano)表示:“我们争先恐后,能够迅速将工作人员召集在一起。我们拥有200余套专用设备来处理铁路和铁路项目,这有助于我们迅速做出反应,并减少团伙和规模较小的人全体人员。”达诺说,尽管时间紧迫,天气令人生畏,但科洛兑现了其项目承诺,证明了科洛为何仍在1,400英里IC&E和其他中西部铁路的承包商呼叫清单上。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号