...
首页> 外文期刊>EUWID Pulp and paper >70% of Germany's industrial sites waste their load control potential
【24h】

70% of Germany's industrial sites waste their load control potential

机译:德国70%的工业基地浪费了其负荷控制潜力

获取原文
获取原文并翻译 | 示例
           

摘要

In order to efficiently integrate renewable energies into the power grid, it becomes increasingly important to manage demand of industrial users. However, 70% of Germany's industrial locations fail to use the enormous potential offered by load control. This is one of the results of a study entitled "Identification and realisation of economic potential for demand-side integration in Germany's industry" issued by the Institute for Energy Economics and Rational Use of Energy (Institut fur Ener-giewirtschaft und Rationelle Energieanwendung - IER) at the University of Stuttgart together with Stadtwerke-Kooperation Trianel, a consortium of municipal utilities. The study, which is only available in German, analyses more than 200 locations of industry for their economic potential for demand side integration (DSI), no matter if their potential is used or as yet unused.
机译:为了有效地将可再生能源整合到电网中,管理工业用户的需求变得越来越重要。但是,德国70%的工业区未能利用负荷控制所提供的巨大潜力。这是能源经济与能源合理利用研究所(Institut fur Ener-giewirtschaft und Rationelle Energieanwendung-IER)发表的题为“德国工业中需求侧整合的经济潜力的识别和实现”的研究结果之一。斯图加特大学与市政公用事业联盟Stadtwerke-Kooperation Trianel一起在斯图加特大学就读。这项研究仅以德语提供,它分析了200多个行业的需求侧整合(DSI)的经济潜力,无论它们的潜力已被使用还是尚未被使用。

著录项

  • 来源
    《EUWID Pulp and paper》 |2016年第4期|9-9|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号