...
首页> 外文期刊>Rail >Task force reveals options for Manchester unblocking
【24h】

Task force reveals options for Manchester unblocking

机译:特遣部队揭示了曼彻斯特解锁的选项

获取原文
获取原文并翻译 | 示例
           

摘要

THE Manchester Recovery Task Force is consulting on three proposals to improve the reliability of train services to, from and through Manchester. If implemented, it is predicted they would reduce delays per train from the current three minutes to between 2.5 and 2.1 minutes. The proposals were published on January 14. Option A features Transport for Wales services from North Wales and Chester re-routed from Manchester Piccadilly and Airport to run to Stalybridge via Victoria. More trains will run through Victoria station to reduce the number of terminating trains, while Buxton services are reduced to an hourly service at off-peak times.
机译:曼彻斯特恢复工作队正在咨询三项建议,从而提高曼彻斯特的火车服务可靠性。如果实施,预测它们将从当前三分钟到2.5和2.1分钟之间的每列火车的延迟减少。该提案于1月14日公布。备选方案,北部威尔士和切斯特的威尔士服务的特色运输从曼彻斯特皮卡迪利和机场重新路由到经过维多利亚州的艰难危机。更多列车将通过维多利亚站进行维多利亚站,以减少终止列车的数量,而Buxton Services将在非高峰时段减少到每小时服务。

著录项

  • 来源
    《Rail》 |2021年第923期|14-14|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号