首页> 外文期刊>Reliability Engineering & System Safety >Quantifying human and organizational factors in accident management using decision tress: the HORAAM method
【24h】

Quantifying human and organizational factors in accident management using decision tress: the HORAAM method

机译:使用决策树量化事故管理中的人为因素和组织因素:HORAAM方法

获取原文
获取原文并翻译 | 示例
           

摘要

In the framework of the level 2 Probabilistic Safety Study (PSA 2) project, the Institute for Nuclear Safety and Protection (IPSN) has developed a method for taking into account Human and Organizational Reliability Aspects during accident management. Actions are taken during very degraded installation operations by teams of experts in the French framework of Crisis Organization (ONC). After describing the background of the framework of the Level 2 PSA, the French specific Crisis Organization and the characteristics of human actions in the Accident Progression Event Tree, this paper describes the method developed to introduce in PSA the Human and Organizational Reliability Analysis in Accident Management (HORAAM).
机译:在2级概率安全研究(PSA 2)项目的框架内,核安全与防护研究所(IPSN)开发了一种在事故管理过程中考虑到人员和组织可靠性方面的方法。在危机组织(ONC)的法国框架中,由专家组成的团队在非常糟糕的安装操作期间采取措施。在描述了二级PSA框架的背景,法国特定的危机组织以及事故进展事件树中的人为行为特征之后,本文描述了开发用于在PSA中引入事故管理中人与组织可靠性分析的方法(荷拉姆)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号