...
首页> 外文期刊>Renewable energy >Development of a geo-information system embedding a spatially distributed hydrological model for the preliminary assessment of the hydropower potential of historical hydro sites in poorly gauged areas
【24h】

Development of a geo-information system embedding a spatially distributed hydrological model for the preliminary assessment of the hydropower potential of historical hydro sites in poorly gauged areas

机译:开发一种嵌入了空间分布水文模型的地理信息系统,用于初步评估欠发达地区历史性水电站的水电潜力

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Unrealized potential for small and micro hydropower generation exists in Europe's thousands of historical hydro sites. However, the evaluation of possible hydro sites requires large amounts of data. Historical hydro sites are mostly located in mountainous and rural areas that are most of the times poorly gauged. Accordingly, feasibility studies of the possible hydro sites in such areas are difficult, costly, and time intensive. This paper presents a methodology for a large-scale preliminary evaluation of possible historical hydropower sites in poorly gauged areas. The developed methodology automates the estimation of the main required parameters for the evaluation of each hydro site in a geo-information system (GIS). The core of the methodology is a fully spatially distributed continuous hydrological model embedded in the GIS, which estimates streamflow values at every point of the drainage network. Simultaneously the system automates the estimation of other important parameters like expected head, environmental sensitivity, grid connections etc. The results of this study highlight the ability of the developed methodology to provide the data required during the inception phase of small hydropower development planning in a cost and time efficient manner. Thus, expensive ground investigations are limited to the most promising sites for hydropower development. (C) 2016 Elsevier Ltd. All rights reserved.
机译:在欧洲成千上万的历史性水电站中,存在小型和微型水力发电的未实现潜力。但是,对可能的水利站点的评估需要大量数据。历史悠久的水利发电站大多位于山区和农村地区,而这些地区大多数时候的测量水平都很差。因此,在这些区域中可能的水利场所的可行性研究是困难,昂贵和费时的。本文提出了一种方法,可以对规模不佳的地区可能的历史水电站进行大规模的初步评估。所开发的方法可以自动估算主要信息参数,以评估地理信息系统(GIS)中的每个水利站点。该方法的核心是嵌入GIS的完全空间分布的连续水文模型,该模型可估算排水网络每个点的流量值。同时,系统可以自动估算其他重要参数,例如预期水头,环境敏感性,电网连接等。这项研究的结果突出了已开发方法的能力,可以以小成本提供小型水电开发计划初始阶段所需的数据。和省时的方式。因此,昂贵的地面调查仅限于最有前途的水电开发场所。 (C)2016 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号