...
首页> 外文期刊>Renewable energy >Small hydropower development in western Himalayas: Strategy for faster implementation
【24h】

Small hydropower development in western Himalayas: Strategy for faster implementation

机译:喜马拉雅山西部的小水电开发:更快实施的策略

获取原文
获取原文并翻译 | 示例
           

摘要

Glacier fed fast moving perennial streams in western Himalayan region present a scope of vast hydro-power potential in this region. Indian states in this region are striving hard to tap this potential by promoting run of the river (RoR) hydropower projects in a big way. However large RoR hydropower projects are being opposed by environmentalists and native communities as they badly affect flora and fauna in the diverted reach and generate huge quantity of muck due to construction of tunnels. Due to diversion of water, large population in the diverted reach of the river is devoid of sufficient water for its consumptive use. In this scenario, small hydropower projects (SHPs) are considered as comparatively more sustainable and greener option for hydropower development in these regions. There are well placed small hydropower policies and various incentives for this sector both from state and central government In spite of all this, the progress of implementation of SHPs is not up to the mark. This study presents case study of small hydropower development in two hydro rich western Indian Himalayan states. Besides it, the study discusses the reasons for slow pace of progress in small hydropower sector and suggests strategy for its faster implementation.
机译:喜马拉雅山西部地区的冰川快速多年生河水流在该地区具有广阔的水电潜力。该地区的印度各州正在努力通过大力推广河流(RoR)水电项目来发掘这一潜力。然而,大型RoR水电项目遭到环保主义者和原住民社区的反对,因为它们严重影响了改道河段的动植物,并因修建隧道而产生大量的泥土。由于水的转移,在河流改道河段的大量人口没有足够的水供其消费。在这种情况下,小型水电项目(SHP)被认为是这些地区水电开发的相对更可持续和更绿色的选择。尽管有所有这些,小水电政策的实施情况还不尽人意,但州和中央政府都对该部门制定了适当的小水电政策和各种激励措施。本研究提供了两个印度西部喜玛拉雅水电资源丰富的小水电开发案例研究。除此之外,该研究还讨论了小型水电部门进展缓慢的原因,并提出了加快实施的策略。

著录项

  • 来源
    《Renewable energy》 |2015年第5期|571-578|共8页
  • 作者

    Deepak Kumar; S.S. Katoch;

  • 作者单位

    Centre for Energy and Environmental Engineering, National Institute of Technology, Hamirpur, Himachal Pradesh, India;

    Centre for Energy and Environmental Engineering, National Institute of Technology, Hamirpur, Himachal Pradesh, India;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Run of the river (RoR); Himalayan; Small hydropower projects (SHPs); Developer;

    机译:河道(RoR);喜马拉雅山小型水电项目;开发者;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号