I-16/I-75 INTERCHANGE IMPROVEMENT PROJECT

机译:I-16 / I-75互换改进项目

获取原文
获取原文并翻译 | 示例
           

摘要

$500 MILLION SAFETY AND MOBILITY MEGAPROJECT: This project is being delivered in seven design and construction phases that will continue through 2030. When complete, new CD lanes, additional interstate lanes, new interstate on- and off-ramps, upgrades to 11 bridges, new walls, and upgraded drainage systems will deliver safer and improved mobility for local commuters and commercial freight. 7 PHASES: Phase 1 (focus on I-16 eastbound at downtown Macon) is scheduled for completion in fall 2021. Completed items include a new on-ramp from Spring Street to I-16 westbound, one bridge, and four MSE walls. Phase 1B—the community mitigation phase that includes two new parks, cultural/historical resource preservation, green space, and streetscaping—is fully complete. Phases 2/3 (focus on I-16/I-75 interchange), designed and let to contract together, are scheduled for a fall 2021 completion date. Phases 4/5 (I-16 east- and westbound from I-75) and Phase 6 (I-75 north- and southbound from I-16) are currently in design/ environmental stages, with 4 and 5 tentatively scheduled to be let in 2021, and phase 6 in 2023.
机译:5亿美元的安全性和机动性巨型项目:该项目分七个设计和施工阶段交付,并将持续到2030年。完成后,新的CD车道,其他州际车道,新的州际上下坡道,新升级到11座桥梁墙壁和升级的排水系统将为当地通勤者和商业货运提供更安全,更好的机动性。 7个阶段:第一阶段(重点是梅肯市区I-16东行)计划于2021年秋季完工。已完成的项目包括从Spring Street到I-16西行的新匝道,一座桥和四座MSE墙。阶段1B(包括两个新公园,文化/历史资源保护,绿地和街道绿化的社区缓解阶段)已完全完成。 2/3期(专注于I-16 / I-75互换)设计并允许一起收缩,计划于2021年秋季完成。目前处于设计/环境阶段的阶段为4/5(I-75的I-16向东和西行)和I-6阶段(I-16的I-75向北和南行),暂定安排4和5在2021年和第六阶段在2023年。

著录项

  • 来源
    《Roads & bridges》 |2020年第2期|11-11|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号