The replacement of the existing Kosciuszko Bridge over Newtown Creek, between the boroughs of Queens and Brooklyn, N.Y., was awarded to Skanska Kiewit ECCO III JV for a $554 million design-build project. Phase 1 of the contract has been underway since May 23, 2014, and entails building a new eastbound structure and demolition of the existing bridge. JP Hogan Coring & Sawing Corp., based in Staten Island, was awarded the contract to remove the bridge deck, piers and pilings of the existing bridge as needed to facilitate the new bridge's construction on Nov. 24, 2014. JP Hogan's team has been using Husqvarna's FS 7000 D flat saw exclusively for all the road sawing, as it is the only Tier 4 emission-compliant flat saw approved by the federal government to meet DEP regulations without the need for additional after-market scrubbers. The saw enabled the team to remove pieces of the bridge deck efficiently and keep ahead of schedule.
机译:Skanska Kiewit ECCO III JV获得了纽约市皇后区与纽约布鲁克林区之间现有的Kosciuszko桥的更换,该工程耗资5.54亿美元。该合同的第一阶段自2014年5月23日起进行,需要建造新的东行结构并拆除现有桥梁。总部位于史泰登岛的JP Hogan Coring&Sawing Corp.已获得合同,根据需要拆除现有桥梁的桥面,桥墩和桩柱,以方便新桥于2014年11月24日的施工。JPHogan的团队一直致力于仅使用Husqvarna的FS 7000 D平锯,即可用于所有道路锯切,因为它是联邦政府批准的唯一符合TiP 4排放标准的平锯,无需任何额外的汽洗器即可满足DEP法规。锯使团队能够有效地拆除桥面的碎片并保持进度。

著录项

  • 来源
    《Roads & bridges》 |2016年第10期|57-57|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号