If there was a working template in place, it wasn't for very long. The Kentucky Lake Bridge project was saturated in highly complex challenges, and perhaps the highest-ranked one involved setting 330,000-lb piles in place. The process involved a template that was floated into place and used to guide the piles, which were up to 199 ft long, 6 ft in diam. and came with 2-in.-thick steel walls, into place. Using an upper and lower template, a hydraulic gate would open up, the pile was swung into position, the gate was closed and the pile, equipped with constrictor plates, was hammered down to resistance. There were over 9,200 kips of resistance in each pile, and some are positioned over 100 ft deep.
机译:如果有一个工作模板,就不会很久了。肯塔基湖大桥项目已经充满了高度复杂的挑战,也许排名最高的项目涉及到放置330,000磅桩的位置。该过程涉及一个模板,该模板浮动到位并用于引导桩,桩长达199英尺,直径为6英尺。并安装了2英寸厚的钢墙。使用上下模板,将打开液压闸门,将桩子摆动到位,关闭闸门,并将装有限流板的桩子锤击至阻力。每堆有超过9,200 kips的阻力,有些则位于100英尺深处。

著录项

  • 来源
    《Roads & bridges》 |2016年第11期|24-24|共1页
  • 作者

    Bill Wilson;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号