...
首页> 外文期刊>Roads & bridges >Full-tilt removal
【24h】

Full-tilt removal

机译:全倾斜移除

获取原文
获取原文并翻译 | 示例
           

摘要

Big piles of snow in the winter, along with normal vegetation growth, can create an important, ongoing challenge for highway crews in Maine. Region 5 of the Maine Department of Transportation (MDOT) put a Gradall XL 4300 Ⅲ excavator to work removing a large earthen ledge along Rte. 164-a job typically handled using conventional excavators. "When a snow plow goes around a big, sharp corner like this, or a school bus tries to get safely through the intersection, visibility is critical, so it's very important that the highway crew has an efficient way to lower a ledge like this," said Steve Sawyer, product support sales representative for C.N. Wood, Gradall distributor for the state of Maine.
机译:冬季,大雪堆以及正常的植被生长会给缅因州的高速公路工作人员带来持续的重要挑战。缅因州交通部(MDOT)的5区放置了Gradall XL 4300Ⅲ挖掘机,以沿Rte拆除大的土架。 164-通常使用传统挖掘机处理的工作。 “当扫雪机绕着这样一个大而陡峭的拐角时,或者校车试图通过交叉路口安全行驶时,能见度至关重要,因此,高速公路工作人员必须有一种有效的方法来降低这样的壁架,这一点非常重要, “ CN产品支持销售代表Steve Sawyer说Wood,Gradall缅因州经销商。

著录项

  • 来源
    《Roads & bridges》 |2015年第4期|38-38|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号