In 2010, the Texas Department of Transportation (TxDOT) started a $2 billion reconstruction of I-35 in central Texas. The 96-mile corridor carries more than 100,000 vehicles per day, with two-thirds of those traveling to final destinations outside the corridor to the north or south. That's more than 30 million vehicle trips per year. With the estimated eight-year construction horizon (2010-2018), the impact would be felt across more than 250 million vehicle trips. In the daytime, 25-30% of the vehicles are trucks, rising to nearly 75% at night. When complete, the roadway will be expanded from four lanes to six in rural areas and to eight lanes in urban areas, with continuous one-way frontage roads.
机译:2010年,德克萨斯州交通运输部(TxDOT)开始在德克萨斯州中部进行20亿美元的I-35重建工作。长达96英里的走廊每天运载超过100,000辆汽车,其中三分之二的车辆要驶向走廊北部或南部以外的最终目的地。每年有超过3千万的车辆出行。根据预计的八年建设期(2010-2018年),将影响超过2.5亿次车辆出行。在白天,有25%至30%的车辆是卡车,到了晚上,这一比例上升到近75%。完工后,道路将由四车道扩展到农村地区的六车道和城市地区的八车道,并具有连续的单向临街道路。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号