...
首页> 外文期刊>Roads & bridges >Pavement renewal
【24h】

Pavement renewal

机译:路面更新

获取原文
获取原文并翻译 | 示例
           

摘要

Until last year, driving on I-40 through Prairie County, Ark., was anything but a pleasure. The concrete pavement was badly faulted and presented a rough, uncomfortable ride for drivers. In late 2011, the Arkansas Highway and Transportation Department (AHTD) began accepting bids to renovate the pavement, which had reached the end of its useful service life. Some 50,000 vehicles travel this four-lane section of I-40 each day, which posed a large challenge for Koss Construction Co., which won the contract. More than 10 miles of 10-in. concrete needed major reconstruction in 215 working days, all while keeping traffic moving along the heavily traveled interstate.
机译:直到去年,驾驶A-40公路穿过阿肯色州的草原县只是一种享受。混凝土路面严重损坏,给驾驶员带来崎,、不舒服的旅程。 2011年下半年,阿肯色州公路和运输部(AHTD)开始接受翻新人行道的投标,该行人路的使用寿命已经到期。每天约有50,000辆汽车在I-40的四车道区间行驶,这对赢得合同的Koss Construction Co.构成了巨大挑战。 10英寸长10英里以上。混凝土需要在215个工作日内进行大规模重建,同时还要保持交通沿繁忙的州际公路行驶。

著录项

  • 来源
    《Roads & bridges》 |2014年第4期|42-42|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号