...
首页> 外文期刊>Roads & bridges >Taking care of the waste
【24h】

Taking care of the waste

机译:照顾废物

获取原文
获取原文并翻译 | 示例
           

摘要

Any experienced contractor has encountered a situation where its work has been called into question. In most instances, these matters are resolved on the site, and repairs are made to correct the problem. But, what happens when the costs of repair are significant and, although the contractor admits a defect exists, it argues the end product will still function and serve the purpose for which it was intended? If the contractor is correct, is it nevertheless liable for the costs of performing the expensive repair work? When a breach of contract involves defective work, the proper measure of damages is the cost of repair. An exception sometimes applies when repair or replacement of defective work leads to unreasonable economic waste. If the repair constitutes economic waste, the proper measure of damages is the difference in market value between the property with the nonconforming work and the property with properly performed work. A recent case, although involving residential work, illustrates the economic waste doctrine.
机译:任何经验丰富的承包商都遇到过对其工作提出质疑的情况。在大多数情况下,这些问题可在现场解决,并进行维修以纠正问题。但是,当维修成本很高时,尽管承包商承认存在缺陷,却辩称最终产品仍将发挥功能并达到预期目的,会发生什么?如果承包商是正确的,它是否还要承担执行昂贵的维修工作的费用?当违反合同涉及不良工作时,适当的损害赔偿措施是维修费用。当维修或更换有缺陷的工作导致不合理的经济浪费时,有时会例外。如果修理构成经济浪费,则损害的适当衡量标准是具有不合格工作的财产与具有适当工作的财产之间的市场价值之差。最近的一个案例,尽管涉及到住宅工作,却说明了经济浪费学说。

著录项

  • 来源
    《Roads & bridges》 |2014年第4期|14-14|共1页
  • 作者

    Larry Caudle;

  • 作者单位

    Kraftson Caudle LLC;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号