...
首页> 外文期刊>Roads & bridges >Testing the pass
【24h】

Testing the pass

机译:测试通过

获取原文
获取原文并翻译 | 示例
           

摘要

The day soils of Iowa don't do highway construction firms any favors. Add in an unseasonably wet spring and a job goes from challenging to nearly impossible. But the soil compaction crew from McAninch Corp. made the nearly impossible a nearly routine job during the construction of an I-80 ramp in Altoona, Iowa. How? Like any project, it takes a committed team from start to finish. A new compaction-measurement technology called MDP, or Machine Drive Power, also played a significant role. "It's a game changer," said Don Taylor, project manager at McAninch. MDP is not a breakthrough in how machines compact. Instead, it evaluates rolling resistance to provide an indication of soil stiffness and load-bearing strength.
机译:爱荷华州的今天的土壤对高速公路建设公司没有任何帮助。加上异常潮湿的春天,工作就会从挑战变为几乎不可能。但是,在爱荷华州阿尔图纳(Altoona)的I-80斜坡建造过程中,麦克安奇公司(McAninch Corp.)的土壤压实小组将几乎不可能的工作变成了日常工作。怎么样?像任何项目一样,它需要一支敬业的团队从头到尾。一种称为MDP的新压实测量技术,即Machine Drive Power,也发挥了重要作用。 McAninch项目经理Don Taylor说:“这改变了游戏规则。” MDP并不是机器紧凑的突破。取而代之的是,它评估滚动阻力,以指示土壤刚度和承载强度。

著录项

  • 来源
    《Roads & bridges》 |2013年第10期|52-52|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号