...
首页> 外文期刊>Roads & bridges >Crossing that bridge
【24h】

Crossing that bridge

机译:过那座桥

获取原文
获取原文并翻译 | 示例
           

摘要

When Ian McPherson looks over the completed project, he thanks his team and the new Volvo EC210C excavator (Circle 906) for taking on some serious lifting. McPherson and his McPherson-Andrews Contracting Ltd. crew had to widen a single-lane road to a two-lane road flanked by new pedestrian sidewalks. During construction, traffic needed to pass without closing the road. They also had to install a concrete precast retaining wall below the road bridge to support the structure. The wall and supports were to be in an area that was steep, treacherous and hard to access. In addition, it was important not to disturb any of the adjacent properties when removing natural obstacles, excavating or moving materials.
机译:当伊恩·麦克弗森(Ian McPherson)查看完工的项目时,他感谢他的团队和新的沃尔沃EC210C挖掘机(906圆)进行了认真的起吊。麦克弗森和他的麦克弗森-安德鲁斯承包有限公司的工作人员不得不将一条单车道的道路加宽为一条两车道的道路,两侧是新的人行道。在施工期间,需要在不关闭道路的情况下通过交通。他们还必须在路桥下安装混凝土预制挡土墙以支撑该结构。墙壁和支撑物应位于陡峭,危险且难以接近的区域。另外,重要的是在清除自然障碍物,挖掘或移动材料时,不要干扰任何相邻的属性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号