A "fast-track" method of deck replacement has recently been in southern Missouri. The concept of full-deck replacement while maintaining traffic (in both directions on a two-lane bridge) during the daytime was proven successful on the Rte. 64 Bridge over Pomme de Terre Lake. (A few temporary lane closures were required to complete some minor construction tasks.) This 1,684-ft-long continuous composite steel-rolled beam bridge was redecked in only six months with the bridge being shut down during each night of construction from 7 p.m. to 7 a.m. The key to this innovative method is match-cast panels that are post-tensioned together after installation. The full-width and full-depth panels are supported by four girders and provide a roadway width of 24 ft 10 in.
机译:最近在密苏里州南部已经采用了一种“快速”的甲板更换方法。在Rte上证明了在白天保持交通畅通(在两车道桥上双向)的全甲板更换概念。 64 Pomme de Terre湖上的桥梁。 (完成一些次要的施工任务需要一些临时的行车道封闭。)这座长1,684英尺的连续式复合钢轧制梁桥在短短六个月内便被重新修整,该桥在每天晚上7时开始关闭。凌晨7点至上午7点是这种创新方法的关键,是火柴浇铸面板,安装后将其后张紧在一起。全宽和全深面板由四个大梁支撑,巷道宽度为24英尺10英寸。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号