...
首页> 外文期刊>RUSI Defence Systems >German Submarines - Capabilities and Potential
【24h】

German Submarines - Capabilities and Potential

机译:德国潜艇-能力和潜力

获取原文
获取原文并翻译 | 示例
           

摘要

The dual commissioning of U26 and U30, which were the last two of the U206 class submarines, was celebrated in March 1975. The U212A class submarines U31 and U32 were put into service in October 2005. These two milestones characterise a unique phenomenon. For more than 30 years, no new submarine had been commissioned by the German Navy. However, in this period the German maritime defence industry succeeded in establishing itself as the world market leader for non-nuclear submarines.
机译:1975年3月庆祝了U26和U30的双重调试,这是U206级潜艇的最后两艘。U212A级潜艇U31和U32于2005年10月投入服务。这两个里程碑是一个独特现象的特征。 30多年来,德国海军没有新的潜水艇服役。但是,在此期间,德国海上国防工业成功地确立了自己的地位,成为无核潜艇的世界市场领导者。

著录项

  • 来源
    《RUSI Defence Systems》 |2006年第2期|p.50-52|共3页
  • 作者

    Raimund Wallner;

  • 作者单位

    Underwater Systems Section in the Armaments Directive of the German Federal Ministry of Defence;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 军事;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号