A tanker was port side to at a dock and crew were installing the portable gangway. Once the gangway was in place between the ship and the dock, a crew member walked to the middle of the gangway and removed the four wire slings, motioning to the crane operator to heave up the rigging, which was connected to a single lifting ring. During the lift, one of the loose slings became entangled between the steps of the gangway, resulting in its sudden movement. The crew member immediately signalled to the crane operator to cease heaving, which he did. The wire sling was removed from the step and the slings were recovered without further issue.
机译:在码头的港口侧是港口,船员正在安装便携式舷梯。一旦舷梯在船和码头之间就位,一名船员就会走到舷梯中间,取下四个线吊索,向起重机操作员动手,向上升起索具,连接到单个提升环。在电梯期间,其中一个松散的吊索在舷梯的台阶之间缠绕在一起,导致其突然运动。机组人员立即向起重机运营商发出信号以停止起重,他确实如此。从步骤中除去钢丝吊带,并且在没有进一步发出的情况下回收吊索。

著录项

  • 来源
    《Safety at sea international》 |2020年第622期|40-40|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号