...
首页> 外文期刊>Space news >Choice On Continuing Ares Looms For New Administration
【24h】

Choice On Continuing Ares Looms For New Administration

机译:新行政当局继续选择战神织机的选择

获取原文
获取原文并翻译 | 示例
           

摘要

U.S. President-elect Barack Obama and the new Congress will face early questions about the nation's goals for space exploration, and at the forefront will be whether to break from the previous administration's plan to replace the 30-year-old space shuttle with a new system optimized for returning humans to the Moon. Congress passed legislation in October intended to be a roadmap for the new administration, with a three-pronged approach to closing an impending gap in U.S. human spaceflight capabilities between the space shuttle's scheduled 2010 retirement and the fielding of the Ares 1 rocket and Orion Crew Exploration Vehicle (CEV). In an effort to buy time for the new administration to assess options for mitigating the gap, Congress called for halting shuttle retirement activities until April 30, authorized $1 billion to hasten production of Ares 1 and directed NASA to pay for crewed demonstration launches aboard commercial spacecraft and rockets such as those currently being developed under the agency's $500 million Commercial Orbital Transportation Services (COTS) program. "Congress teed up several issues and sent clear signals on funding levels through the [2008 NASA Authorization]," said Bill Ad-kins, a Washington-based aerospace consultant and former Republican staff director for the House Science space and aeronautics subcommittee. "It was an invitation for the new administration to really weigh in and sign up to the current goals and fund them accordingly. But if the money isn't mere, then priorities need to be set. NASA has muddled along too long doing too much with too little."
机译:美国当选总统巴拉克·奥巴马(Barack Obama)和新一届国会将面临有关美国太空探索目标的早期问题,而最重要的问题是,是否要打破上届政府用新系统取代拥有30年历史的航天飞机的计划为使人类重返月球而优化。国会在10月通过了旨在成为新政府路线图的立法,采取了三管齐下的方法来弥合美国航天飞机在2010年计划的退休与阿瑞斯1号火箭和猎户座乘员组之间的即将来临的差距。车辆(CEV)。为了让新政府有时间评估缓解差距的方案,国会呼吁停止航天飞机退役活动至4月30日,授权10亿美元加快Ares 1的生产,并指示NASA支付商业航天器上的乘员示范发射费用以及目前由该机构耗资5亿美元的商业轨道运输服务(COTS)计划开发的火箭。华盛顿航空航天顾问,众议院科学空间与航空小组委员会前共和党参谋长比尔·阿德·金斯(Bill Ad-kins)说:“国会解决了几个问题,并通过[2008 NASA授权]发出了明确的拨款信号。” “这是邀请新政府认真考虑并签署当前目标并相应地为其提供资金。但是,如果这笔钱不光是,那就需要确定优先事项。美国航空航天局(NASA)长期以来一直在做太多事情太少了。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号