...
首页> 外文期刊>Space news >Two High-priority NASA Earth Science Missions Face 1-Year Slip
【24h】

Two High-priority NASA Earth Science Missions Face 1-Year Slip

机译:两次高度优先的NASA地球科学任务将面临1年的延误

获取原文
获取原文并翻译 | 示例
           

摘要

Nasa could be forced to delay two approved, top-tier Earth science missions by up to one year due to congressional inaction on the president's 2011 spending request, which has U.S. federal agencies operating at their 2010 spending levels, according to sources and documents. NASA had hoped to spend about $5 billion on Earth- and space-science missions in 2011, but the funding available under the current stopgap spending measure, or continuing resolution, falls-$450 million short of that total, the documents show.
机译:根据消息来源和文件显示,由于国会对总统2011年的支出要求不采取行动,美国国家航空航天局可能被迫将两次批准的顶级地球科学任务推迟最多一年,而美国联邦机构的运作则以其2010年的支出水平为依据。文件显示,美国宇航局曾希望在2011年在地球和太空科学任务上花费约50亿美元,但根据当前的权宜之计支出措施或持续解决方案,可用资金比该总额少了4.5亿美元。

著录项

  • 来源
    《Space news》 |2011年第10期|p.6|共1页
  • 作者

    AMY SVITAK;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号