...
首页> 外文期刊>Space news >1st Minotaur 4 Launch Assigned New Payload
【24h】

1st Minotaur 4 Launch Assigned New Payload

机译:1st Minotaur 4发射分配了新的有效载荷

获取原文
获取原文并翻译 | 示例
           

摘要

Amid technical problems and delays with its new Minotaur 4 rocket, the U.S. Air Force has swapped payloads for the launcher's planned April debut, opting to place a suborbital hypersonic demonstration vehicle ahead of a critical space surveillance satellite on the manifest.rnThe Minotaur 4, built by Orbital Sciences Corp. of Dulles, Va., was supposed to debut this past fall with the launch of the Air Force's Space Based Space Surveillance satellite, which is designed to keep tabs on objects in geostationary orbit. That launch was put on hold when the rocket's third-stage motor was found to be producing more thrust than expected. The Minotaur 4's first three stages are based on excess U.S. ballistic missile hardware.
机译:由于新的Minotaur 4火箭存在技术问题和延误,美国空军已为计划于4月首次发射的载具交换了有效载荷,选择将亚轨道高超音速演示飞行器放置在清单上的关键空间监视卫星之前.rn Minotaur 4的建造弗吉尼亚州杜勒斯的轨道科学公司(Orbital Sciences Corp.)计划于今年秋天首次亮相,其目标是发射空军的天基空间监视卫星,该卫星旨在保持对地静止轨道上的物体的活动。当发现火箭的第三级发动机产生的推力超出预期时,该发射被暂停。 Minotaur 4的前三个阶段是基于过量的美国弹道导弹硬件。

著录项

  • 来源
    《Space news》 |2010年第3期|3|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号