1.Airbus to build Skynet 6A under noncompetitively awarded contract 2.U.K. plans for Skynet 6 call for gapfiller satellite, a longer-term solution, and ground system maintenance 3.Skynet 5A moved from 6°E to 97°E 4.As of yet, architecture of Skynet 6 not known 5.The U.K. MoD shortlisted four consortia for Skynet 6 ground control facility operations.
展开▼