首页> 外文期刊>SPE Reservoir Evaluation & Engineering >Performance drivers in restimulation of gas-storage wells
【24h】

Performance drivers in restimulation of gas-storage wells

机译:重新评估储气井的绩效驱动因素

获取原文
获取原文并翻译 | 示例
           

摘要

To maintain or enhance deliverability of gas-storage wells in the Clinton sand in northeast Ohio, an annual restimulation program Was established in the late 1960s. The program calls for as many as 20 hydraulic fractures and refractures per year. Several wells have been refractured three to four times, while there are still wells that have only been fractured once in the past 30 years. As the program continues, many wells will be stimulated a sec- ond, third, or fourth time. This paper summarizes an attempt to care- Fully study the response of the Clinton sand to hydraulic fracture and To identify the performance drivers in each series of fracture jobs.
机译:为了维持或提高俄亥俄州东北部克林顿沙丘中储气井的产能,1960年代后期制定了年度再模拟计划。该计划每年要求多达20处水力压裂和裂缝。几口井已被压裂三至四次,而在过去30年中,仍有几口井仅被压裂过一次。随着程序的继续进行,第二,第三或第四次将对许多井进行增产。本文总结了以下尝试:全面研究克林顿砂对水力压裂的响应,并确定每个系列压裂作业的性能驱动因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号