...
首页> 外文期刊>Technical Textiles International >Gore Tenara helps to score an historic first at Wimbledon
【24h】

Gore Tenara helps to score an historic first at Wimbledon

机译:戈尔·特纳拉(Gore Tenara)帮助温布尔登取得历史性第一

获取原文
获取原文并翻译 | 示例
           

摘要

History was made on 29 June when the first competitive match ever to be played under cover at the historic Wimbledon tennis tournament took place in London, UK.rnA new £ 100 million retractable, concertina-design roof over therntournament's Centre Court is made of approximately 5200 m2 of Gore Tenara architectural fab-ric.W.L. Gore and Associates, the fabric's manufacturer, says Tenara was selected in part for its ability to let light pass through while offering reliable protection from the elements.rnThe roof comprises two styles of the fabric, the major part allowing 40% light transmission (Gore Tenara 4T40) and some allowing 20% (Gore Tenara 4T20). The two styles are precisely placed to prevent shadows or bright spots on the court.
机译:历史可追溯到6月29日,当时在英国伦敦举行的有历史意义的温布尔登网球锦标赛上,有史以来第一次进行了有掩护的比赛.rn Therntournament中心球场上方新的1亿英镑可伸缩,六角琴设计的屋顶由大约5200个组成平方米的戈尔·特纳拉(Gore Tenara)建筑工厂面料制造商Gore and Associates表示,选择Tenara的部分原因是它能够让光线通过,同时又能提供对元素的可靠保护.rn屋顶包含两种款式的面料,主要部分允许40%的透光率(Gore Tenara 4T40),有些则允许20%(戈尔·特纳拉4T20)。精确定位这两种样式以防止在球场上出现阴影或亮点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号