Voltaire will have the biggest leg encircling crane ever installed on a wind turbine installation vessel, enabling it to have crane capacity of over 3,ooot, and allowing efficient installation of the next generation offshore wind turbine. Joop Roodenburg, president of Huisman, said: "As the next generation wind turbines are becoming bigger and bigger, we keep on pioneering to develop novel and innovative solutions to install these turbines".
展开▼