首页> 外文期刊>The Motor ship >Cruise work rounds off busy year for German yards
【24h】

Cruise work rounds off busy year for German yards

机译:邮轮工作结束了德国船厂的繁忙年度

获取原文
获取原文并翻译 | 示例
           

摘要

Cruise ships have been to the fore at the German repair yards during the latter part of 2010, writes Tom Todd. Rounding off the year in typical style for Blohm + Voss Repair in Hamburg has been the 54,763gt Thomson Dream, in for more than a month of general overhaul work in the yard's Dock 11. The work, being completed early December after a stay of more than a month, was extensive. It included a rudder swap, the installation of an additional stern thruster, upgrading of two existing bow thrusters, generators and seawater valves as well as the exchange of the auxiliary engine block and diverse pipe works.
机译:汤姆·托德(Tom Todd)写道,在2010年下半年,游轮在德国维修厂崭露头角。在汉堡的Blohm + Voss修理公司以54763gt的Thomson Dream圆满结束了典型的一年,对船坞Dock 11进行了一个多月的大修。这项工作在经过了更多的停留之后于12月初完成。超过一个月,是广泛的。它包括更换舵,安装一个额外的船尾推进器,升级两个现有的船首推进器,发电机和海水阀,以及更换辅助发动机组和各种管道工程。

著录项

  • 来源
    《The Motor ship》 |2010年第1077期|p.40-41|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号