...
首页> 外文期刊>The Railway Magazine >TIMETABLE CHANGES WINTER 2013/4
【24h】

TIMETABLE CHANGES WINTER 2013/4

机译:2013/4冬季时间表变更

获取原文
获取原文并翻译 | 示例
           

摘要

One of the biggest changes to this year's winter timetable is on East Midlands Trains, where journey times over the Midland Main Line are being shortened after the investment of £70million by Network Rail in track upgrading, resignalling and alignment work. Sections of the MML have been upgraded to permit 125mph running for the first time and, as a result, the fastest journey between Sheffield and London will be two hours, while average times get a seven-minute cut to 2hr 10min. Times from Derby, Nottingham and Leicester all see reductions. There's also a new 10.16 Corby-London service, created by extending the 09.00 St Pancras to Kettering.
机译:今年冬季时间表的最大变化之一是东米德兰兹火车(East Midlands Trains),在Network Rail投资7000万英镑进行轨道升级,重新标记和对中工作后,米德兰干线的行车时间缩短了。 MML的各个部分已升级,首次允许以125英里/小时的速度行驶,因此,从谢菲尔德到伦敦的最快旅行时间为2小时,而平均时间则缩短了7分钟,降至2小时10分钟。德比,诺丁汉和莱斯特的时间都在减少。通过将09.00 St Pancras扩展到Kettering,还创建了一个新的10.16 Corby-London服务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号