...
首页> 外文期刊>The Railway Magazine >New Thameslink operator unhappy with the multiple units it will inherit
【24h】

New Thameslink operator unhappy with the multiple units it will inherit

机译:新的Thameslink运算符对它将继承的多个单元不满意

获取原文
获取原文并翻译 | 示例
           

摘要

Just weeks after taking over from First Capital Connect, Govia Thameslink Railway has criticised the Class 700 EMUs it is to be supplied with. Govia is unhappy to find that little provision has been made for tables or even seatback drop-down trays in the units, despite the fact that they will be running long distances to places such as King's Lynn, Peterborough, Bedford and the South Coast. Such an "obvious" provision should have been made, Govia executives believe. The fact that only a handful of the 1,140 Class 700 vehicles have been built by Siemens so far gives hope that a retrospective modification can be made to the majority of the fleet, but it is understood that the DfT, which ordered the trains, signed a contract containing no such provisions. If Govia wants the changes, therefore, Siemens is likely to insist on increased payment.
机译:从First Capital Connect接管仅几周后,Govia Thameslink铁路公司就批评将为其提供700类动车组。 Govia很不高兴地发现,小已编列经费用于表或单位甚至椅背下拉托盘,尽管他们将要运行长距离的地方,如金斯林,彼得伯勒,贝德福德和南部海岸的事实。戈维亚高管相信,这样的“明显”规定应该已经作出。到目前为止,西门子仅生产了少量的1,140辆700级汽车,这一事实使人们希望可以对大多数车队进行追溯修改,但据了解,订购列车的DfT签署了一份不含此类条款的合同。因此,如果戈维亚(Govia)需要更改,西门子很可能会坚持增加付款。

著录项

  • 来源
    《The Railway Magazine》 |2014年第1364期|12-12|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号