首页> 外文期刊>The Railway Magazine >Bridqnorth works beefed up by SVR
【24h】

Bridqnorth works beefed up by SVR

机译:Bridqnorth的工作由SVR加强

获取原文
获取原文并翻译 | 示例
           

摘要

Investment in Bridgnorth shed and works is increasing production and accelerating the rate at which locos on the Severn Valley Railway are overhauled. Extra resources have included the recent recruitment of two new staff and the launch of the Heritage Skills Training Academy in September, which was funded from the SVR's recent share issue and the Severn Valley Railway Charitable Trust. 'West Country' No. 34027 Taw Valley is in the latter stages of overhaul at Bridgnorth MPD, but will not be ready for Santa trains.
机译:对Bridgnorth的投资得以流失,工程正在增加产量,并加快了Severn Valley铁路机车检修的速度。额外的资源包括最近招募了两名新员工,并于9月启动了传统技能培训学院,该资金由SVR最近发行的股票和Severn Valley Railway Charitable Trust资助。布里河谷MPD的“西部国家” 34027 Taw Valley处于后期检修阶段,但尚未为圣诞老人列车做好准备。

著录项

  • 来源
    《The Railway Magazine》 |2013年第1353期|79-79|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号