...
首页> 外文期刊>The Railway Magazine >Traction & Stock News
【24h】

Traction & Stock News

机译:牵引与股票新闻

获取原文
获取原文并翻译 | 示例
           

摘要

The final two HST power cars to be refurbished and fitted with MTU400 engines, Nos. 43002 and 43003, were handed over to First Great Western by Brush Traction, which carried out the re-engining, in a ceremony at Loughborough on February 27. Attended by Brush representatives, with guests from First Group, MTU, Angel Trains and Porterbrook Leasing, Brush m.d. John Bidewell said the project to re-engineer 117 power cars for FGW had been completed on time and on budget. First currently operates a fleet of 53 HSTs, and a 54th set will arrive from National Express East Coast (NXEC) in December. The project has given the 30-year-old power cars a new lease of life and such has been the success with reduced fuel consumption, lower noise and fewer emissions that GNER (now NXEC) and Crosscountry Trains have opted to replace their existing Valenta or VP185 engines with MTU4000s.
机译:在2月27日在拉夫堡举行的仪式上,最后两辆将进行翻新并装有MTU400发动机的HST动力汽车,编号分别为43002和43003,它们被刷子牵引技术公司转让给第一大西部汽车公司,该发动机进行了重新设计。通过Brush代表,来自First Group,MTU,Angel Trains和Porterbrook Leasing,Brush md的客人约翰·比德维尔(John Bidewell)说,为FGW重新设计117辆动力汽车的项目已按时,按预算完成。 First公司目前拥有53个HST机队,第54批HST机队将于12月从National Express East Coast(NXEC)到达。该项目使拥有30年历史的动力汽车获得了新的生机,并获得了成功,其油耗降低,噪音降低和排放减少了,因此GNER(现为NXEC)和越野列车选择更换现有的Valenta或带有MTU4000的VP185引擎。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号