首页> 外文期刊>Thermal engineering >Topping with a Natural Gas-Fired Combined Cycle Unit of a Coal-Fired Cogeneration Power Plant with Cross Connections
【24h】

Topping with a Natural Gas-Fired Combined Cycle Unit of a Coal-Fired Cogeneration Power Plant with Cross Connections

机译:顶部采用带有交叉连接的燃煤热电厂的天然气燃烧的综合循环单元

获取原文
获取原文并翻译 | 示例
           

摘要

Thermal power plants (TPP) with cross connections and having a minimum reference fuel rate of 321 g/(kW h) prevail in the structure of the generating capacities in Russia. In practice, this characteristic is often above 500 g/(kW h). Application of parallel-type, dual-fuel combined-cycle units (CCUs) using coal as the main fuel, for improving the efficiency of power plants with cross connections is considered. Such CCUs have high efficiency and are suitable for modernization of operating subcritical power plants with cross connections. The power of CCUs with gas turbines manufactured in Russia or having a high degree of production localization in Russia can be as high as 200–250 MW. In all the cases, a new heat-recovery steam generator (HRSG) and a new steam turbine for a live-steam pressure of 12.8 and 8.8 MPa must be developed. The paper considers the process features of such dual-fuel cogeneration CCUs based on a 6FA gas turbine. A CCU thermal scheme is developed. Bled steam conditions under different operating conditions are determined considering the bypass of the main condensate and feedwater lines. GCU performance indices as a function of ambient air temperature are determined. In addition, an option was considered for modernizing the existing cogeneration power plant (TETs) in the town of Seversk by implementation of a dual-fuel CCU based on an 82 MW 6FA gas turbine and a T-96/122-8.8 steam turbine while maintaining the coal-fired power steam boilers in operation. It is demonstrated that the proposed modernization option makes it possible to reduce the fuel cost by approximately 240 million rubles per year while increasing the electricity delivery under cogeneration conditions by 1.7 times.
机译:具有交叉连接的热电厂(TPP)和具有321g /(kW h)的最小参考燃料速率在俄罗斯发电能力的结构中占上风。在实践中,这种特性通常高于500克/(kWh)。考虑了用煤作为主燃料的平行型,双燃料组合循环单元(CCU),用于提高具有交叉连接的发电厂的效率。此类CCU具有高效率,适用于具有交叉连接的操作亚临界发电厂的现代化。 CCU与俄罗斯制造的燃气轮机的力量或俄罗斯在俄罗斯具有高度生产本地化的能力可以高达200-250兆瓦。在所有情况下,必须开发出新的热回收蒸汽发生器(HRSG)和用于活蒸汽压力为12.8和8.8MPa的新型蒸汽轮机。本文考虑了基于6FA燃气轮机的双燃料热电联产CCU的过程特征。开发了CCU热方案。考虑到主要冷凝物和给水线的旁路,确定在不同操作条件下的Bled蒸汽条件。确定GCU性能指标作为环境空气温度的函数。此外,通过基于82MW 6FA燃气轮机和T-96 / 122-8.8汽轮机的双燃料CCU的实施,考虑了通过实施双燃料CCU在Seversk镇中现代化的热电电厂(TETS)的选项。保持燃煤电力蒸汽锅炉运行。结果表明,建议的现代化选择使得每年将燃料成本降低约2.4亿卢布,同时将电源条件下的电力递送增加1.7倍。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号