首页> 外文期刊>Thermal engineering >Automation of Operations for Starting Power Units Equipped with Once-Through Boilers
【24h】

Automation of Operations for Starting Power Units Equipped with Once-Through Boilers

机译:配备直流锅炉的启动动力装置的操作自动化

获取原文
获取原文并翻译 | 示例
           

摘要

An attempt is made to generalize the experience gained from solving some problems pertinent to arrangement of operations for starting a power unit. Starting up of a modern power unit is the most complicated procedure of all its operating modes. This is because a large number of continuous and discrete control operations have to be carried out in the course of starting processes, the equipment reliability criteria lie in a narrow range, some items of equipment may be unavailable or fail during starting operations, and the level to which these operations are automated is rather low. The task ZAO Interavtomatika specialists set before themselves from the very Beginning of their work has always been to essentially improve the level to which domestically produced power units are furnished with automatic control systems through using the capacities available in modern instrument and control systems (I&CSs).
机译:试图概括从解决一些与启动动力装置的操作有关的问题中获得的经验。启动现代动力装置是所有操作模式中最复杂的过程。这是因为在启动过程中必须执行大量连续和离散的控制操作,设备可靠性标准在狭窄的范围内,某些设备项在启动操作期间可能不可用或发生故障,并且级别这些操作是自动化的,其使用率较低。 ZAO Interavtomatika专家从一开始就摆在他们面前的任务始终是,利用现代仪表和控制系统(I&CS)的可用能力,从根本上提高国产动力装置配备自动控制系统的水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号