首页> 外文期刊>Transit Australia >Auckland City Rail Link
【24h】

Auckland City Rail Link

机译:奥克兰市铁路

获取原文
获取原文并翻译 | 示例
           

摘要

With the work to get the CRL built as far as Wyndham Street effectively underway, it appears that AT are starting to shift their focus to the rest of the project. They will obviously want to get as much of the planning and design work for this done so that construction is able to start as soon as possible after the Government confirms funding. AT have said in the past that the earliest that works could start on the rest of the project is 2018. As part of their preparation, AT are looking to develop their procurement strategy so they can get the best value for money and, to do so, they are now sounding out the industry to help work out the best way of doing things. This means considering what type of procurement model they will use, what kinds of contracts they will use, how they will split up the project if they do so at all and a range of other matters.
机译:随着有效地建立CRL到Wyndham Street的工作正在进行,AT似乎已开始将重点转移到该项目的其余部分。他们显然希望完成这项工作的大部分规划和设计工作,以便在政府确认资金投入后尽快开始施工。 AT过去曾表示,最早可以在项目的其余部分开始的工程是在2018年。作为其准备工作的一部分,AT正在寻求制定采购策略,以便使其物有所值,为此,他们现在正在向业界发出声音,以帮助制定最佳的处事方式。这意味着要考虑他们将使用哪种类型的采购模型,将使用哪些类型的合同,如果他们完全这样做将如何拆分项目以及一系列其他事项。

著录项

  • 来源
    《Transit Australia》 |2016年第3期|74-74|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号