CBD Workers were busy in the city centre in 2015 up to Christmas Eve, when work stopped to make way for the Boxing Day sales and New Year crowds. George Street, between Essex and King Streets ALTRAC Light Rail carried out utility relocation works in the northern section of George Street in the CBD, taking advantage of the summer holiday period to work over January weekends. These have involved utility investigations; modification of electrical pits and associated utility works, investigation of new stormwater drainage, road pavement works and investigative potholing. Some pits are a similar size to a studio apartment and so require substantial work.
机译:直到圣诞节前夕,2015年圣诞节前夕,CBD工人们都在市中心忙碌,当时工作停止,为节礼日销售和新年人群腾出了空间。埃塞克斯(Essex)和国王街(King Streets)之间的乔治街(George Street),ALTRAC轻轨公司利用CBD乔治街的北部地区,利用暑假期间在一月的周末工作。这些涉及公用事业调查。改造电坑和相关的公用工程,调查新的雨水排放,道路铺装工程和调查性坑洼。一些维修站的尺寸与一室公寓相似,因此需要大量工作。

著录项

  • 来源
    《Transit Australia》 |2016年第4期|108-108|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号