...
首页> 外文期刊>Transit Australia >The Epping to Chatswood Rail Link Part 2
【24h】

The Epping to Chatswood Rail Link Part 2

机译:查茨伍德铁路链接的Epping第二部分

获取原文
获取原文并翻译 | 示例
           

摘要

The three new stations are designed to operate in a similar manner to existing RailCorp stations. They comprise entry structures, an unpaid passenger concourse, a paid passenger concourse, rail platforms and a "back of house" area for station staff and administration functions. These three stations have the same basic configuration with differences in the orientation of entrances and concourse configuration.rnEach of the new underground stations incorporates two "service buildings", one at each end of the station. The service buildings contain: railway signalling/communications equipment, electrical power distribution equipment, traction power substations and sectioning switches; maintenance rooms; tunnel ventilation system axial fans and dampers; tunnel emergency exit stairways.
机译:这三个新站点的设计与现有RailCorp站点的运行方式相似。它们包括入口结构,无偿乘客大厅,有偿乘客大厅,铁路平台以及车站工作人员和管理职能的“房屋后部”区域。这三个站具有相同的基本配置,但入口的方向和大厅的配置有所不同。rn每个新的地下站都包含两个“服务大楼”,每个站的一端。服务大楼包括:铁路信号/通信设备,配电设备,牵引变电所和分段开关;维修室;隧道通风系统轴流风机和风门;隧道紧急出口楼梯。

著录项

  • 来源
    《Transit Australia》 |2010年第6期|P.185187-188|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号