...
首页> 外文期刊>Trenchless Technology >Illinois Village Solves Its I/I Problem Through Trenchless Methods
【24h】

Illinois Village Solves Its I/I Problem Through Trenchless Methods

机译:伊利诺伊州村庄通过无沟渠方法解决其I / I问题

获取原文
获取原文并翻译 | 示例
           

摘要

The Village of Villa Park, 111., located about 20 miles west of downtown Chicago, took on a comprehensive review of its Sanitary Sewer Master Plan in order to update it according to present and future needs.The goals of the update were to ensure adequate future capacity from possible annexation of unincorporated areas and to prepare a 10-year capital plan to reduce inflow and infiltration (I/I) to the system and to provide long-term service.
机译:位于芝加哥市区以西约20英里处的111号别墅公园村对下水道总体规划进行了全面审查,以根据当前和未来的需求进行更新,更新的目的是确保足够未来可能的合并未合并地区的能力,并准备一项为期十年的资本计划,以减少系统的流入和渗透(I / I)并提供长期服务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号