...
首页> 外文期刊>Trenchless Technology >HDD Success in Poland
【24h】

HDD Success in Poland

机译:硬盘在波兰的成功

获取原文
获取原文并翻译 | 示例
           

摘要

In the Polish city of Kielce, a 76-m long HDPE pipe OD 160 mm had to be laid to the exhibition area. This pipe laying job had to been done using trenchless technology because the exhibition entrance had to be crossed and not disturbed.rnContractor Ekobox Sp. z.o.o. was responsible for this project. Based in Kielce, Ekobox employs approximately 100 workers and specializes in installations for telecom, power lines and road lighting. Ekobox is also a specialist for trenchless pipe and cable laying and for many years has worked with piercing tools. Recently, Ekobox added to its equipment fleet the horizontal directional drilling machine TERRA-JET 4015 S, which was used on this particular project.
机译:在波兰的凯尔采市,必须向展区铺设外径为160 mm的76米长HDPE管。管道铺设工作必须使用非开挖技术完成,因为必须跨过展览入口且不要打扰。rn承包商Ekobox Sp。动物园。负责这个项目。 Ekobox的总部设在Kielce,雇用约100名工人,专门从事电信,电力线和道路照明的安装。 Ekobox还是非开挖管道和电缆铺设的专家,多年来一直使用穿孔工具。最近,Ekobox在其设备机队中增加了水平定向钻机TERRA-JET 4015 S,该钻机已在该特定项目中使用。

著录项

  • 来源
    《Trenchless Technology》 |2010年第5期|58-59|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号