Air Hammer Technology Used on Texas HDD Project

机译:德克萨斯州硬盘项目使用的空气锤技术

获取原文
获取原文并翻译 | 示例
           

摘要

On a pipeline installation near Godley, Texas, pipeline contractor Pumpco Inc. of Giddings, Texas, was contracted to install numerous 12-in. steel pipeline laterals. The job took place in the Barnett Shale Formation, southwest of Fort Worth, which is one of the most active drilling locations in central Texas.rnOn the last remaining bore, Pumpco was faced with several challenges: a 640-ft bore that included 35 ft of elevation changes and crossing a Santa Fe railroad track and Texas Highway 171. The challenge was further compounded by ever-changing subsurface conditions, which alternated between unconsolidated soil and rock to solid shale and limestone formations.
机译:在得克萨斯州戈德利附近的管道安装中,得克萨斯州吉丁斯的管道承包商Pumpco Inc.被合同安装了许多12英寸管道。钢质管道支管。这项工作是在沃思堡西南部的Barnett页岩地层进行的,该地区是德克萨斯州中部最活跃的钻探地点之一。在剩下的最后一个钻孔中,Pumpco面临着一些挑战:640英尺的钻孔包括35英尺的钻孔。高度变化以及穿越圣达菲铁轨和德克萨斯州171号高速公路的挑战。地下条件的不断变化使挑战进一步加剧,地下条件在未固结的土壤和岩石之间转换为固体页岩和石灰石地层。

著录项

  • 来源
    《Trenchless Technology》 |2010年第6期|P.70-72|共3页
  • 作者

    Don Cary;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号