首页> 外文期刊>Trenchless Technology >Pneumatic Boring Head
【24h】

Pneumatic Boring Head

机译:气动镗头

获取原文
获取原文并翻译 | 示例
           

摘要

When traveling through the Mississippi River Valley of La Crosse,Wis., the challenges of construction work are quite evident. The towering, tree lined and rock-laden bluffs that surround the Mississippi, Black and La Crosse rivers are beautiful, yet intimidating, to anyone having to complete a project in the area.rnIn the summer of 2010, Ellingson Companies - which specializes in agricultural drainage, directional drilling, cured-in-place pipe repair and a wide variety of trenchless technologies - partnered with the City of La Crosse on a challenging water main installation project.The main will supply water to a soon-to-be constructed, 150,000-gal, reinforced-concrete storage tank, located on the crest of one of the many bluffs on the western outskirts of the City.
机译:当穿越威斯康星州拉克罗斯的密西西比河谷时,建筑工作面临的挑战是显而易见的。环绕密西西比河,布莱克河和拉克罗斯河的高耸,绿树成荫,岩石多岩石的悬崖对任何必须在该地区完成项目的人来说都是美丽而又令人生畏的。rn在2010年夏天,专门从事农业的Ellingson公司排水,定向钻探,现场固化管道维修以及多种非开挖技术-与拉克罗斯市合作开展了具有挑战性的供水总管项目,该总管将为即将建造的15万供水-gal钢筋混凝土储罐,位于城市西郊众多虚张声势之一的山顶上。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号