...
首页> 外文期刊>Trenchless Technology >GEONEX HORIZONTAL HAMMER DRILLING HAS LANDED IN NORTH AMERICA
【24h】

GEONEX HORIZONTAL HAMMER DRILLING HAS LANDED IN NORTH AMERICA

机译:GEONEX水平锤钻头已降落在北美

获取原文
获取原文并翻译 | 示例
           

摘要

One casing was for a water main, while the other was for a gravitational sanitary sewer. The crossing length was 175 ft, and the soil was fractured bedrock in the beginning and turned into mixed soil with cobbles and occasional boulders. The drilling path also penetrated some perched groundwater pockets. The job was first specified for Auger boring, but penetration into the rock face turned out to be insufficient. After trying with auger boring, the project turned to Horizontal hammer drilling. The job was carried out in four days, including mobilization to the jobsite. Both holes were drilled successfully, and grades were well inside tolerances. The highway experienced no settlement or heave and the actual conduct pipes will be installed inside the casings with centralizers. Overall, a very successful project. Contractors interested in the method came to see the job all the way from California.
机译:一个套管用于给水总管,另一个套管用于重力卫生下水道。穿越长度为175英尺,土壤在开始时就裂开了基岩,变成了带有鹅卵石和偶有巨石的混合土壤。钻探路径还穿透了一些栖息的地下水袋。该工作最初是为进行俄格钻孔而指定的,但事实证明钻入岩壁的深度不足。尝试进行螺旋钻镗削后,该项目转向水平锤钻。这项工作在四天内完成,包括动员到现场。两个孔均已成功钻孔,并且坡度在内部公差范围内。高速公路没有沉降或隆起,实际的导管将安装在带有扶正器的套管内。总体而言,这是一个非常成功的项目。对这种方法感兴趣的承包商从加利福尼亚一直都在看这项工作。

著录项

  • 来源
    《Trenchless Technology》 |2019年第8期|18-18|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号