Hong kong: MTR Corporation awared VINCI Construction contract 1103 - Hin Keng to Diamond Hill tunnels - part of the new Shatin to Central Link mass transit railway, worth EUR 280M (USD 362M. The contract comprises 2,475m of drill and blast and 1,400m twin tunnels to be excavated by slurry TBM with 7.4m diameter.
展开▼