CIPP Lateral Sewer Rehabilitation: Does It Perform As Expected?

机译:CIPP侧排污水管道修复:是否按预期执行?

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A major challenge faced by nearly every utility is how to address its aging underground infrastructure. Sewer pipes are failing from coast to coast as America finds itself on a fast track to replace or renew sewer collection systems. A major driving force is the mandate set forth by state and federal regulators that require utility owners to renew their systems so they are watertight. Today, if a utility uses State Revolving Loan Funds (SRF) to pay for its sewer rehabilitation project, the design must be justified based on life-cycle cost analysis. This requirement is imposed by legislation passed by the U.S. Congress in 2014 known as the Water Resource Reform and Development ACT (WRRDA). Even without the requirement for such an analysis, a responsible utility should perform one to ensure the best value for the rate payer's investment. The days of ground water infiltrating and overloading pipes, pumps and wastewater treatment plants at public expense is now a priority to correct.
机译:几乎每家公用事业公司都面临的主要挑战是如何应对其老化的地下基础设施。随着美国发现自己在更换或更新下水道收集系统的快速轨道上,下水道管道在各个海岸之间都在失败。主要驱动力是州和联邦监管机构制定的授权,要求公用事业业主更新其系统,以确保其水密性。如今,如果公用事业公司使用国家循环贷款基金(SRF)支付其下水道修复项目的费用,则必须根据生命周期成本分析来证明设计合理。这项要求是由美国国会于2014年通过的称为“水资源改革与发展法案(WRRDA)”的立法强加的。即使不需要进行这种分析,负责任的公用事业公司也应该执行一项工作,以确保纳税人的投资获得最佳价值。如今,需要优先解决的问题是,公共费用使地下水渗入和超负荷的管道,泵和废水处理厂的日子。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号