An essential element in many projects to rehabilitate buried pipe is the design and construction of a bypass system to carry flow during the period the segment being restored is out of service. In many instances, design and installation of the bypass is just as complex as the job of rehabilitating the pipe. A recent example is the bypass needed for cured-in-place pipe (CIPP) lining that involved 6,100 feet of 54-inch diameter reinforced concrete sewer pipe for a project for Jefferson County, AL. To accommodate required daily flow rates, the bypass system required five runs of 18-inch HDPE pipe totaling 18,500 feet and six 18-inch Sunbelt Quiet Flow pumps. The project owner was the Jefferson County Commission. Prime contractor was Layne Inliner, Sunbelt Rentals was the contractor for the bypass system and CH2MHill was the project engineer.
机译:在许多修复地下管道的项目中,必不可少的要素是旁路系统的设计和建造,该系统可在被修复的管段停用期间输送流量。在许多情况下,旁路的设计和安装就像修复管道一样复杂。最近的一个例子是现场浇铸管道(CIPP)衬里所需的旁路,该衬砌涉及6100英尺直径的54英寸直径的钢筋混凝土污水管,用于阿拉巴马州杰斐逊县的一个项目。为了适应所需的日流量,旁路系统需要运行五次18英寸的HDPE管,总长为18,500英尺,并需要六台18英寸的Sunbelt Quiet Flow泵。该项目的所有者是杰斐逊县委员会。主要承包商是Layne Inliner,Sunbelt Rentals是旁路系统的承包商,CH2MHill是项目工程师。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号