...
首页> 外文期刊>Pipeline and underground utilities construction >Mega-Size Sewer Lift Station Construction Requires Unique Shoring System
【24h】

Mega-Size Sewer Lift Station Construction Requires Unique Shoring System

机译:大型下水道提升站建设需要独特的支撑系统

获取原文
获取原文并翻译 | 示例
           

摘要

Like many other communities across the country, Fishers, IN, a suburb of Indianapolis, is in the process of upgrading their aging sewer infrastructure to keep pace with growth and new development. This means replacing miles of sewer lines and manholes, and installing new lift stations. One recent lift station installation project let by the Hamilton Southeastern Utilities Company was unusual due to the sheer enormity and shape of the structure: a poured-in-place behemoth measuring 52 by 29 feet, with height ranging from 14 to 40 feet.
机译:像全国其他许多社区一样,印第安纳波利斯郊区的印第安纳州费希尔斯(Fishers)正在升级其老化的下水道基础设施,以跟上增长和新发展的步伐。这意味着要更换数英里的下水道和检查井,并安装新的提升站。汉密尔顿东南公用事业公司最近进行的一个电梯站安装项目因其巨大的结构和形状而与众不同:一个现成的巨型庞然大物尺寸为52 x 29英尺,高度为14到40英尺。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号