...
【24h】

Boring Las Vegas

机译:无聊的拉斯维加斯

获取原文
获取原文并翻译 | 示例
           

摘要

Doing any kind of road work in downtown Las Vegas is going to take some planning, but installing 4,500 feet of fiber-optic cable in the middle of the city is going to require weeks of painstaking coordination. This was the case for Brian Dunlevy and his crew at Team Fishel in Las Vegas.The company was hired by AT&T to reinforce an existing fiber line, which will upgrade to a new long-haul fiber communications line and make a dark fiber integration between AT&T and Level 3 Communications, which operates one of the largest communications and Internet backbones in the world. Dark fibers are lines that have yet to be used within cables that have been laid and are not yet connected to any device.
机译:在拉斯维加斯市中心进行任何类型的道路工程都需要做一些计划,但是在城市中心安装4,500英尺的光缆将需要数周的艰苦协调。 Brian Dunlevy和他在拉斯维加斯的Fishel团队的工作人员就是这种情况。AT&T雇用了该公司来加固现有的光纤线路,这将升级到一条新的长距离光纤通信线路,并使AT&T之间的暗光纤集成和Level 3 Communications,该公司运营着世界上最大的通信和Internet主干网之一。深色光纤是尚未铺设在电缆上且尚未连接到任何设备的电缆。

著录项

  • 来源
    《Underground Construction》 |2008年第3期|p.44-45|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号