...
首页> 外文期刊>Underground Construction >Difficult Slipline Necessitated Innovative Solutions
【24h】

Difficult Slipline Necessitated Innovative Solutions

机译:艰难的滑索需要创新的解决方案

获取原文
获取原文并翻译 | 示例
           

摘要

The $8.9 million Henrico County, VA, Four-mile Creek Trunk Sewer Rehabilitation Project Contract No. 1 involved sliplining 4,000 feet of 84-inch deteriorated concrete sanitary gravity sewer pipe with 72-inch fiberglass pipe.The project is in a growing suburban area east of Richmond, VA. It involved six horizontal curve sections and three crossings of a major interstate highway. Although there was enough room to slipline with a 78-inch liner pipe, the design engineer and owner decided to specify a 72-inch liner pipe due to the uncertainties of the condition of the pipe and the curved sections. This major interceptor sewer is very active and flows about half full most of the time - significantly more during wet weather.
机译:弗吉尼亚州亨里科县(Henrico County)的890万美元,四英里小溪主干污水管道修复项目合同第一号涉及将4,000英尺的84英寸老化的混凝土卫生重力排污管道与72英寸玻璃纤维管道衬砌在一起。该项目位于东部一个不断发展的郊区弗吉尼亚州里士满市。它涉及一个主要的州际公路的六个水平曲线部分和三个交叉口。尽管78英寸衬管有足够的滑移空间,但由于管道和弯曲截面的不确定性,设计工程师和所有者决定选择72英寸衬管。这个主要的拦截器下水道非常活跃,大部分时间都充满水-在潮湿的天气下流量大得多。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号